Civil Services Prepby Garima Malik & Nitin Sangwan Account

UPSC · Prelims and Mains

Environment, Ecology and Climate

← Historical EIA 2020 draft comparison

Draft 2020 proposed annual rather than half-yearly compliance reporting

Whole chapter · 13–19 focused hours

Environmental clearances, forest diversion and remedies

The general EIA methods in environment.assessment-and-sustainability and the forest-rights module in polity.special-areas-and-classes have already been studied. First study of the selected approval and tribunal provisions.

Includes

  • Selected legal provisions and the short ministry explanation
  • Comparison of authority roles, approval conditions and remedies
  • Available mapped practice, error analysis and an initial closed-book review

Separate time needed

  • Repeated study of generic EIA stages, forest-rights eligibility or claims procedures
  • Later revisions, full mock tests and ongoing amendment tracking
  • Current project classifications, operational filing, fee tables and litigation advice

Editorial planning estimate; not learner timing data

    Where to study this topic
    Whole chapter reading
    • Environmental Impact Assessment Notification 2006: original instrument ↗

      Original 14 September 2006 notification, paragraphs 2, 4(i–iii), 7(i) stage overview, I, II(i) definition, III(i) definition and III(ii), (vi–vii), IV(i), 8(i–ii) authority relationship, and 10 compliance-report principle; PDF pp. 2–8. Assign conceptual roles and distinctions only. Exclude original project schedules, thresholds, exemption lists, deadlines, deemed permissions and validity periods as present procedure. This is not a consolidated current notification. Read with the 8 August 2024 ministry explanation for continued framework context.

    • Consolidated Guidelines and Clarifications under the forest conservation framework ↗

      Act section 2(1)(i–iv), PDF p. 7, and section 3, p. 8; Rules 2023 rule 9(1), p. 15; 10(10) and 11(1–7), pp. 20–21; 11(12), p. 21; handbook 2.1, p. 53, and 3.1–3.2, p. 62. Study central approval, conditional stages, other-law/forest-rights compliance, compensatory afforestation, NPV and monitoring. Exclude section 1A land-scope litigation, non-forest-purpose exceptions, fee/rate tables and current project-specific permission advice. ID denotes the rule version, not a verified publication year of this compilation.

    • The National Green Tribunal Act, 2010 ↗

      Retained India Code Act: sections 14(1–2) and 15(1–2), PDF p. 10; 16(h–i), 17(1–3), p. 11; 19(1–2), p. 12; 20, p. 13. Jurisdiction, remedies, clearance appeals, natural justice, mandated principles and liability distinctions. Exclude limitation periods, changing Schedule I contents, appointment rules and obsolete evidence/criminal-law cross-references. No claim that this retained copy alone verifies every current amendment.

    • Natural disasters in Himalayan region: parliamentary reply, 8 August 2024 ↗

      Natural disasters in Himalayan region, parliamentary reply dated 8 August 2024: first two paragraphs only. EIA 2006 as amended, assessment stages, environmental/social impacts and site-specific disaster mitigation in EMP. Exclude fund allocations and later disaster-management paragraphs. A dated explanatory supplement, not the consolidated notification or an assertion that every stage applies to every project.

    • Consent under Water and Air Acts: two-stage framework ↗

      Opening two consent-stage definitions only: establishment and operation after installation of pollution-control systems. This state-board overview illustrates the distinction for activities requiring consent. Exclude universal coverage assumptions, fee/delegation tables, fixed renewal periods and current exemption eligibility; it is not a national compliance checklist.

    • Draft Environmental Impact Assessment Notification 2020 ↗

      Historical draft only: preamble and clause 1(ii), PDF pp. 1–2; clause 14(1–2), pp. 18–19; clause 20(4), p. 28; clause 22(1–3), p. 29; Appendix I paragraph 3.1, p. 47. Compare with the original 2006 instrument, distinguishing continuities from proposals. The draft states that commencement requires a final Gazette notification; it is not proof of enactment or current procedure. No exhaustive amendment, exemption or later judicial-law survey; no diagrams assigned.

    • Environmental Impact Assessment Notification 2006: original instrument ↗

      Historical comparison supplement: paragraph 7(i) III(i)(e–f), paragraph 10(i) and Appendix IV paragraph 3.1, PDF pp. 5,8,38. Compare the original instrument with the draft, not the fully amended law as of 2020 or today.

    Related past questions